Copyright © Guangdong Huafeng Tongchuang New Energy Technology Co., Ltd. All Rights Reserved. Site Map
1. In the early stage, we will focus on the customer's needs, provide our company's high-reliability products that have been tested by the market, demonstrate our professional capabilities and experience, and lay the foundation for cooperation.
2. After reaching a cooperation intention, we will analyze the customer's product needs, provide our professional advice to customers, and assist the customer in building a product concept that meets its market needs.
3. Achieve product specification requirements with the customer, develop molds and production fixtures according to customer requirements, assemble and test verification, and complete the product realization process.
4. If the customer needs design services, our designers will provide opinions for the customer's reference and provide customized design.
Ⅰ. Prototype according to the customer's requirements. Some products need to be molded, and the mold opening fee needs to be borne by the customer. (If the number of orders reaches a certain number, we can return the corresponding mold fee)
Ⅱ. After both parties have determined the drawings, they will sign a contract and pay a deposit. The production time starts from the completion of the customized mold.
Ⅲ. The delivery time of standard products will not exceed 45 days. The delivery time of new mold products will be extended by 30~45 days (30 days for hardware molds, 45 days for injection molds and die-casting molds)